Progress Photos: 2007

    December 2007

      arrowMain Street Bridge Abutment.
      I-25 Trinidad construction project
        arrowCommercial Street Northbound Off Ramp Retaining Wall and Viaduct Piers in the background. I-25 Trinidad construction project
      arrowMain Street Bridge Abutment and Northbound On Ramp Wall.
      I-25 Trinidad construction project
        I-25 Trinidad construction project
      arrowPurgatoire River Bridge Pier construction.
      I-25 Trinidad construction project
         
      arrowPreparations to pour the Northbound Viaduct.
      I-25 Trinidad construction project   I-25 Trinidad construction project
      I-25 Trinidad construction project   I-25 Trinidad construction project
      I-25 Trinidad construction project   arrowNorthbound Viaduct Pier construction.
      I-25 Trinidad construction project
      arrowPre-cast deck panel placement on the Northbound Viaduct.
      I-25 Trinidad construction project   I-25 Trinidad construction project
      I-25 Trinidad construction project    
       
      arrowPier construction at the Purgatoire River Bridges.
      I-25 Trinidad construction project   I-25 Trinidad construction project
      I-25 Trinidad construction project    
       
    November 2007
      arrowCranes lift Viaduct Girders into place.
      I-25 Trinidad construction project
        I-25 Trinidad construction project
      I-25 Trinidad construction project    
       
      arrowNorthbound Viaduct Girders arriving at the job site.
      I-25 Trinidad construction project
        arrowNorthbound Viaduct Girders ready for installation.
      I-25 Trinidad construction project
      arrowConstruction of sanitary sewer lines in Commercial Street.
      I-25 Trinidad construction project
         
       
    October 2007
      arrowPier and abutment progress on the northbound viaduct.
      I-25 Trinidad construction project   I-25 Trinidad construction project
      I-25 Trinidad construction project   I-25 Trinidad construction project
      I-25 Trinidad construction project   I-25 Trinidad construction project
    September 2007
      arrowWorkers make final preparations to the Main Street Bridge Abutment Caissons as the MSE abutment face is placed.
      I-25 Trinidad construction project
        arrowThe Main Street abutment will be backfilled with earth as each successive level of MSE panels is placed.
      I-25 Trinidad construction project
      arrowViaduct demolition near University St. where steel plate girders were used to span the railroad.
      I-25 Trinidad construction project   I-25 Trinidad construction project
      arrowViaduct demolition.
      I-25 Trinidad construction project
        arrowViaduct demolition over the railroad tracks.
      I-25 Trinidad construction project
      arrowViaduct demolition near University St.
      I-25 Trinidad construction project
        arrowDemolition of the Depot Building.
      I-25 Trinidad construction project
      arrowViaduct demolition and view of several new Viaduct Piers.
      I-25 Trinidad construction project
        I-25 Trinidad construction project
    August 2007 (middle of the month)
      arrowDemolition work continues on the northbound viaduct.
      I-25 Trinidad construction project   I-25 Trinidad construction project
      I-25 Trinidad construction project   I-25 Trinidad construction project
      I-25 Trinidad construction project    
      arrowA mixer truck empties fresh concrete into the pump truck that will deliver it to the top of the waiting form work for a viaduct pier.
      I-25 Trinidad construction project
        arrowWorkers consult design plans to place final reinforcing for the pier cap within the previously completed form work for a viaduct pier.
      I-25 Trinidad construction project
      arrowA completed viaduct pier with most of the form work removed. Workers will now do minor surface repairs in preparation for the final finishes.
      I-25 Trinidad construction project
        arrowThe pump truck delivering fresh concrete into the pier form. Workers on the pier ensure there are no voids in the pour.
      I-25 Trinidad construction project
      arrowAerial view of Commercial Street area looking north. Note the two column foundations identifiable by the vertical green steel protected by barriers.
      I-25 Trinidad construction project
        arrowAerial view of the Commercial Street staging area. Notice the form materials and partially tied steel cages for the pier columns.
      I-25 Trinidad construction project
    August 2007 (early in the month)
      arrowDemolition of the northbound viaduct structure.
      I-25 Trinidad construction project   I-25 Trinidad construction project
      I-25 Trinidad construction project   I-25 Trinidad construction project
      I-25 Trinidad construction project   I-25 Trinidad construction project
      I-25 Trinidad construction project    
      arrowPile driving next to Commercial Street
      I-25 Trinidad construction project
        arrowPile driving analyzer on viaduct pile driving operation.
      I-25 Trinidad construction project
      arrowViaduct pier column and cap reinforcing steel in its pre-tied cage sits on the ground awaiting installation within the form work.
      I-25 Trinidad construction project
        arrowReinforcing steel for the pier columns is delivered in 'kit' form to be assembled on site. The "green steel" has a rust inhibitive coating.
      I-25 Trinidad construction project
      arrowViaduct pier form work ready for the installation of the pre-tied reinforcing steel cage.
      I-25 Trinidad construction project
        arrowA crane lifts the pre-tied reinforcing steel cage into its place within the form.
      I-25 Trinidad construction project
      arrowProgress on the MSE wall panels with a good view of the ashlar wall texture.
      I-25 Trinidad construction project
         
    July 2007
      arrowConstruction continues and installation of abutment caissons for the I-25 bridge at Main Street is making progress.
      I-25 Trinidad construction project   I-25 Trinidad construction project
      I-25 Trinidad construction project   I-25 Trinidad construction project
      I-25 Trinidad construction project   I-25 Trinidad construction project
      I-25 Trinidad construction project    
      arrowA large crane lifts a new precast concrete storm sewer inlet into place at Main Street.
      I-25 Trinidad construction project
        arrowWorkers use the crane to make final elevation adjustments to the inlet before connecting pipe.
      I-25 Trinidad construction project
      arrowWorkers tie the reinforcing steel cages for a viaduct pier column.
      I-25 Trinidad construction project
        arrowPrefabricated form panels will be used to shape the concrete viaduct piers.
      I-25 Trinidad construction project
      arrowForm panels can be assembled used and then disassembled and used again on the next pier.
      I-25 Trinidad construction project
        arrowWorkers patch a pier form panel to ensure a smooth concrete finish.
      I-25 Trinidad construction project
      arrowAn MSE or Mechanically Stabilized Earth wall being constructed at the Commercial Street Ramp. I-25 Trinidad construction project   arrowAn MSE wall consists of a system of inter- locking precast concrete panels visible here.
      I-25 Trinidad construction project
      arrowBehind the MSE wall panels attached metal strips mechanically stabilize each successive layer of the earth fill giving this system its name.
      I-25 Trinidad construction project
        arrowThe front face of the MSE wall panels have been formed to create a pattern resembling an ashlar wall.
      I-25 Trinidad construction project
      arrowA Temporary Amtrak station is in place on the project and being readied for service.
      I-25 Trinidad construction project
         
    June 2007
      arrowInstallation of abutment caissons for the I-25 bridge at Main Street.
      I-25 Trinidad construction project   I-25 Trinidad construction project
      I-25 Trinidad construction project    
      arrowPreparing to drive steel "H" piles for one of the I-25 Viaduct pier footings.
      I-25 Trinidad construction project
        arrowThe cage contains a "hammer" that is raised and dropped to drive steel "H" piles to bedrock for a Viaduct pier near Pine Street.
      I-25 Trinidad construction project
      arrowOnce all the piles for a footing are in place, forms are constructed to place a concrete pile cap. Workers here are tying the cap reinforcement.
      I-25 Trinidad construction project
        arrowThe vertical reinforcing bars, green with a protective epoxy coating, will lap with the pier column steel above.
      I-25 Trinidad construction project
      arrowWorkers place concrete in the pile cap form for a completed footing. Each pier footing will contain several pilings and a pile cap.
      I-25 Trinidad construction project
         
    May 2007 (late in the month)
      arrowThe contractor clears superstructure debris from under the south bound I-25 structure at Main Street.
      I-25 Trinidad construction project
        arrowA crawler nibbles away at the pier cap of the Main Street bridge during the final stages of demolition.
      I-25 Trinidad construction project
      arrowWorkers layout forms that will be used to place concrete for the footing of the Main Street Ramp retaining wall.
      I-25 Trinidad construction project
        arrowWorkers place pre-cast concrete components of the new storm sewer system.
      I-25 Trinidad construction project
      arrowAssembled on the ground, the reinforcing steel cage is lifted for placement in the drilled shafts for the new Main Street bridge foundation.
      I-25 Trinidad construction project
        arrowWorkers guide the reinforcing steel cage into the drilled shaft. The visible tube is a steel casing which prevents collapses of the shaft. This type of foundation is called a caisson.
      I-25 Trinidad construction project
      arrowReinforcing steel protruding from the finished caissons form the connection between the foundation and the bridge Abutment 1 above ground.
      I-25 Trinidad construction project
        arrowThe caissons have been filled with concrete as the casing was being removed. This set of caissons provides a deep foundation for Main Street Abutment 1 that reaches to bedrock far below.
      I-25 Trinidad construction project
    May 2007 (early in the month)
      arrowA crane lifts the sign bridge that identifies the Main Street Ramp exit.
      I-25 Trinidad construction project
        arrowA worker repairs a bridge deck that will carry detour traffic.
      I-25 Trinidad construction project
      arrowPhotos of clearing and grubbing at Main Street Ramp 1.
      I-25 Trinidad construction project   I-25 Trinidad construction project
      I-25 Trinidad construction project   I-25 Trinidad construction project
    April 2007
      arrowPhoto looking north on I-25 at mile post (MP) 13. It shows the contractor paving the median detour crossover, setting concrete barrier in the south bound lanes, and constructing a retaining wall at the Main St. off ramp.
      I-25 Trinidad construction project
        arrowAll traffic will be detoured to the north bound lanes allowing the contractor to remove and replace south bound I-25 lanes and structures.
      I-25 Trinidad construction project